Experience
Ecclesiastical Facilities
Addition
Resurrection Lutheran Church, Bloomington, IL
Structural Consulting
Apostolic Christian Church, Gridley, IL
Addition
Roanoke Mennonite Church, Roanoke, IL
Addition Planning
College Avenue Baptist Church, Normal, IL
Addition
North Danvers Mennonite Church, Danvers, IL
Addition
St. Mark’s Lutheran Church, Normal, IL
Fellowship Hall/Gymnasium Addition:
St. Stephen’s Parish, Streator, IL
Original Buildingand First Addition
Our Saviour Lutheran Church, Normal, IL
HVAC Modification
Church of Christ, Bloomington, IL
Addition
First Evangelical United Brethren Church, Bloomington, IL
Addition
Apostolic Christian Church, Fairbury, IL
Addition
Presbyterian Church, Gibson City, IL
Addition
St. John’s Lutheran Church, Washburn, IL
New Building
American Lutheran Church, Gibson City, IL
Addition
Presbyterian Church, LeRoy, IL
Renovation/Addition
St. Mary’s Church, Downs, IL
Addition
Calvary Baptist Church, Normal, IL
Addition
Holy Trinity Elementary School, Bloomington, IL
Historic Restoration
Colony Church, Bishop Hill, IL
Addition
Congerville Mennonite Church, Congerville, IL
Addition/Renovation
St. Clare Parish, Bloomington, IL
Addition
St. Steven’s Parish, Streator, IL
Educational Facilities
Middleton Associates Incorporated has worked on over 700 Educational projects throughout the State of Illinois for many districts including, but not limited to, the following types of work:
Life Safety Surveys and Implementation
Building Renovations
Energy Conservation Studies and Implementation
Re-roof Projects (over 5,200,000 sq. ft.)
Boiler Replacements and Temperature Control Renovations
Virden CUSD #4, Virden, IL
Old School Demolition
Virden High School Energy Conservation Study
Virden High School Boiler Replacement
Virden High School Re-roof and Rehabilitation
Robinson CUSD #2, Robinson, IL
Extensive Life Safety Renovation Work
Re-roof ‑ Three Buildings
Door and Window Replacement
Planning for New High School
Temporary Building Planning ‑ Lincoln School
Olympia Community Unit School District #16, Stanford, IL
Remodeling and New Kitchen
Danvers Elementary School. Mary’s Church, Downs, ILÂ
Addition
Olympia Middle School
Addition
Minier‑Armington Elementary School
Site Improvements
Olympia High School
Track and Field Improvements and Drainage Work
 Olympia High School Repaving
600 space parking lot
Olympia High/Middle School
Geo
Thermal at High School
McLean County Unit District #5, Normal, IL
ADA Surveys
All Buildings
Rehabilitation
Brigham Elementary, Original Building
Rehabilitation
Normal Community High School, Original Building
Planning Study
Normal Community High School
Rehabilitation
Normal Community High School
Rehabilitation
Brigham Elementary, Original Building
New Building
Fairview Elementary School
Addition
 Fairview Elementary School to Quad K‑6
Second Addition
Fairview Elementary School
Third Addition
Normal Community High School, Core Facility & Gymnasium
Drainage and Paving
Normal Community High School
New Building
Chiddix Junior High School
New Building
Colene Hoose Elementary School
First Addition
Colene Hoose Elementary School
Second Addition
Colene Hoose Elementary School to Quad K‑6
Addition
 Carlock Elementary School, Gymnasium and Classrooms
Addition
 Glenn Elementary School
Addition
 Oakdale Elementary School to Quad K‑6
Addition
 Hudson Elementary School
Addition
 Towanda Elementary School
New Building
Sugar Creek Elementary School
New Building
Parkside Elementary School
Life Safety Surveys and Implementation throughout District
Addition
Chiddix Junior High School
Addition
Normal Community High School
Addition
Parkside Junior High School
Macomb CUSD #185, Macomb, IL
Re-roof ‑ Three Buildings
New Electric Service ‑ Two Buildings
Science Laboratory Planning
Remodeling at Macomb High School
Planning Additions and Remodeling for Edison School
Additions for Lincoln School
Temporary Building Foundations ‑ Edison School
Geo-Thermal at Edison School
Mendota CUSD #289, Mendota, IL
Life Safety Inspection/Renovation ‑ Three Buildings
Referendum Planning for Elementary Addition
Mendota Blackstone Elementary School Addition
Lincoln School Kitchen and office Renovation
Argenta‑Oreana School District #, Argenta, IL
Re-roof Elementary/Middle School Building
Henry‑Senachwine CUSD #5, Henry, IL
Life Safety Survey
Life Safety Survey Implementation
Junior High School Locker Room Renovation
Hall High School District #502, Spring Valley, IL
Extensive Life Safety Work
Illinois State University, Normal, IL
New Building
Turner Hall
New Building
Stevenson Hall
New Building
Center for the Visual Arts
New Building
Ropp Agricultural Laboratory Building
New Building
Harris Physical Plant
New Building
Greene Food Center, Central Receiving and Central Bakery
New Building
ORL Laundry
Site Development
Quad (Central Campus Pedestrian Arteries)
Addition
Ropp Agricultural Laboratory, Greenhouse
Addition
Garden Room, Manchester Residence Hall
Addition
Community Room, Shelbourne Student Housing
Remodel
Feeney Food Center Kitchen (Hamilton‑Whitten/Atkin‑Colby)
Remodel
Central Heating Plant
Remodel
Cardinal Court Student Housing
Remodel
Shelbourne Student Housing, Window Replacement, Re-roof, Siding
Remodel
Residence Hall Kitchen Waste Conversion Renovation
Remodel
Shawnee Conference Room
Re-roof
Turner Hall
Partial Re-roof
Redbird Arena
Re-roof
Horton Fieldhouse
Tech-Zone Relocation (as of June, 2006, construction has begun)
Milner Library – Under Plaza Walkway Improvements
Fieldcrest / Minonk‑Dana‑Rutland CUSD #108, Minonk, IL
Studies
Planning
Middle School and New Athletic Facilities
Addition
High School Gymnasium and Music Room
Remodeling
New District Office
Addition
Minonk Elementary School
High School Site Work
Miscellaneous Re-roof Projects
Miscellaneous Tuck Pointing Projects
Life Safety Surveys and Implementation
High School Boiler Replacement
Elementary School Boiler Replacement
Elementary School Paved Playground
Addition – Fieldcrest West
Addition – Fieldcrest South
Eureka CUSD #140, Eureka, IL
Addition
Davenport Elementary School
New Building
Eureka Middle School and Site Development
Renovation
High School Track
Miscellaneous Life Safety Surveys and Implementation
Woodstock CUSD #200, Woodstock, IL
New Building
Woodstock Junior High School
Low Point‑Washburn CUSD #21, Washburn, IL
Addition
Washburn Junior High School
Tonica CCSD #79, Tonica, IL
Renovation
Extensive Remodeling of Facilities
Financial Facilities
Eureka Federal Credit Union ‑ Normal, IL
Peoples Bank Drive‑Thru Addition ‑ Normal, IL
Peoples Bank East Side ‑ Normal, IL
Peoples Bank ‑ Normal, IL
Peoples Bank First Addition, Normal, IL
Citizens Savings and Loan ‑ Normal, IL
Citizens Savings and Loan Addition ‑ Normal, IL
Citizens Savings and Loan ‑ El Paso, IL Branch
Citizens Savings and Loan ‑ Eureka, IL Branch
Citizens Savings and Loan, Rear Entrance Remodel ‑ Normal, IL
Oakwood Bank ‑ Oakwood, IL
Galesburg Credit Union – Galesburg, IL
Handicap Accessibility – ADA Inspections
McLean County Unit District #5, Normal, IL
- ADA Inspections and report
- Chiddix Junior High School
- Parkside Junior High School
- Fairview Elementary School
- Sugar Creek Elementary School
- Colene Hoose Elementary School
- Glenn Elementary School
- Oakdale Elementary School
- Towanda Elementary School
- Brigham Elementary School
- North Point Elementary School
- Parkside Elementary School
- Hudson Elementary School
Capital Development Board
- Kickapoo State Park
- Moraine View State Recreation Area
- Clinton Lake State Recreation Area
- Weldon Springs State Recreation Area
- Iroquois County State Recreation Area
- Walnut Point State Fish & Wildlife Area
- Middle Fork State Fish & Wildlife Area
- David Davis Mansion State Historic Site – Installation of lift, ramp, and accessible public restrooms.
Middleton Associates Incorporated has completed many projects which address handicap accessibility issues including ramps, elevators, lifts and other accessible elements that are a natural part of any project, as required by various state and federal legislation.
Industrial Facilities
Warehouse Addition, B & J Sales, Bloomington, IL
Production & Warehouse Addition, Bloomington Offset Printing
Production & Warehouse Addition, Illinois Graphics
Production & Warehouse Addition, Mechanical Devices Company, Bloomington, IL
Diamond Star, Construction Office
Eureka Company
Normal Plant Addition
Miscellaneous Structural and Remodel Work, Bell Street Plant
Bloomington Consulting for El Paso, Texas
Union Camp Corporation
Normal Plant Loading Dock Renovation
Normal Plant Equipment Installation & Foundation
Normal Plant Re-roof
Normal Plant Warehouse Additions
Sumpter, SC Plant ‑ Limited Consulting
Normal Plant Gaitronics System
Normal, IL Public Works Garage
GTE Marion Tops ‑ Addition
GTE GSC Warehouse Addition, Bloomington, IL
GTE Normal Addition
GTE Hennepin ‑ New Building
GTE Highland Addition
GTE Kewanee ‑ New Building
GTE Roscoe Addition
GTE Mahomet ‑ New Building
GTE Mossville ‑ New Building
GTE Over 80 Small Additions, Remodels and Structural Consulting
GTE Sandwich ‑ New Building
GTE Mt. Olive ‑ New Building
GTE Lincoln ‑ GSC Warehouse Addition
GTE Microwave ‑ Standard Building Design
GTE Wonder Lake ‑ Addition
GTE London Mills ‑ New Building
Office Facilities
Van Gundy Agency ‑ Normal, IL
Country Companies East Annex ‑ Bloomington, IL
Country Companies Annex Remodel ‑ Bloomington, IL
Bliss McKnight Office Building ‑ Bloomington, IL
Normal Township Building ‑ Normal, IL
Telecourier Tower Center ‑ Bloomington, IL
Connoisseur Media Remodel – Tower Center – Bloomington, IL
Union Insurance Group Exterior Renovation ‑ Bloomington, IL
Union Insurance Office Expansion and Remodel ‑ Bloomington, IL
Citizen Savings and Loan Office Building ‑ Normal, IL
Central Illinois Psychiatric – Normal, IL
afni – New building/remodel/consulting – Bloomington, IL
Nayak Allergy Clinic – Normal, IL
Central Illinois Psychiatry Clinic – Normal, IL
Renovation and Restoration
David Davis Mansion State Historic Site, Bloomington, IL
Phase 1: Historic structures report: Documentation, structural survey, materials survey, historic documentation of all elements of the facility.
Phase 2: Complete exterior restoration of Carriage Barn, Barn Stable, Wood House, Foaling Shed and Mansion to 1870‑1880 period.
Phase 3: Complete interior restoration of mansion including all finishes, structural modifications, climate control, handicap accessibility (as appropriate to a historic site), heating and cooling, electrical work, and security and fire detection work.
Woodford County Courthouse, Eureka, IL
- Complete renovation and structural rework of three level bell tower and dome, including total replacement of supporting structural elements, restoration and new copper flashings.
Mt. Pulaski Courthouse State Historic Site, Mt. Pulaski, IL
- Historic structures report and selected restoration of exterior and interior elements.
Union Insurance Building, Bloomington, IL
- Renovation of two buildings into new use as office building.
- Renovation of south and west facades providing new appearance and new accessible employee entrance.
Vandalia Statehouse State Historic Site - Vandalia, IL
- Renovation of Cupola
- Basement Remodeling and HVAC Renovations
- Roof, exterior, and site restoration
Colony Church - Bishop Hill State Historic Site
- Historic structures report
- Selective Restoration (planning stage)
Livingston County Courthouse - Pontiac, IL
- Complete exterior restoration
University of Illinois – Urbana, IL
- Replacement of gutters and downspouts at the Main Library, Kinley and Altgeld Halls
Woodford County Courthouse
- Bell Tower and Dome Restoration